BLUEPRINT REQUIREMENTS
Back to Webquest Main Page





Drawing #1:  This is an overall drawing of your solar cooker.  It should show all features of
your creation and have them labeled and numbered. All pages within the packet should contain a
list of materials needed to build the cooker. This first drawing will be the introductory page for
your packet of drawings and therefore, should have a title.

Drawing #2-?:This drawing, and all that follow, should be of the individual features
numbered on your initial drawing of your cooker.

*All blueprint drawings should be completed on graph paper.
*All blueprint drawings should be completed with pencil only!
*All blueprint lettering should be completed in manuscript (printed) style.
*All blueprint drawings should have a complete list of building materials.
*Packet of drawings should be placed in 3-holed folder before presented to the teacher.