| A | B |
| ALI | Ack Line Item |
| Cut | An action sent to the mainframe |
| Box | An action sent to the mainframe |
| Tubticket | It is placed on a tub |
| Complete | All items assigned to an operator have been finished |
| Spread | The action of streching out the material prior to cutting |
| Spreadteam | People that lay out the fabric in th preparation for cutting |
| RF | A hand held scanner |
| DCT | A fixed scanning unit |
| Productionticket | It determins what items will be cut together |
| productionschedule | Determines when a lay should be cut based on the shippping schedule |
| takeoffteam | A team that places components in tubs after a lay has been cut. |
| gerber | A machine that cuts the material into a pattern. |
| gypsylogon | Activated by pressing F21. |
| lay | A lot. |
| lotid | Combination of lay and component. |
| poly | Foam |
| SST | Out-dated technology |
| UHF | Used to communicate with the server |
| Flash | An act of putting an operating system on a scanner |