| When laying out a building it should be both ________ and _______ in order to isure that the rest of the job will go smoothly. | square, level |
| Using the 3-4-5 rule to determine if a corner is square what would the middle distance be if the carpenter measured 9 feet, and 12 feet on sides? | 15 |
| What are pieces of wood called that are used to hold the string used to measure a job site? | batter boards |
| The plumb lines are used to measure the ________ of the foundation? | corner |
| The string lines measure the _________. | outside dimension |
| Name the type of drawing that shows something in detail. | detail drawing |
| What will the distance be between two strings of a true 90 degree angle if one side measures 3 feet, the other 4 feet? | 5 |
| If the string lines of a foundation are square, then measuring the corners diagonally both measurements would be _________. | equal |
| The batter boards should be right on top of the work. t/f | false |
| Name the type of drawing that shows something from a raised angle. aka looking across at it. | elevated |
| Name the type of drawing that shows the interior of something. | sectional |
| Studs are usually placed how far apaart? | 16 inches on center |
| If a sole plate or bottom plate is resting on concrete then what type of wood should be used to avoid termites and the wood decomposing? | pressure treated wood |