Construction Final Review part 4 Barbra Jackson

AB
____ are one of the major economic indicators reflecting the overall health and direction of our economyHousing Starts
Historically a master builder wasthe person resposible for both the design and the construction of a project
The three principal players on any construction project are theOwner, Architect, and contractor
The two types of professional designers areArchitects and engineers
According the three legged stool of construction managment istime cost and quality
the purchasing of construction services is often referred to ascontracting
the parties primarily responsible for code compliance isis the contractor and designer
True or false with design-bid-build the design is not typically 100% complete when the owner gives the contractor the notice to proceedfalse
In construction, contract documents are commonly referred to as thePlans and specs
According to the lecture in a lump sum contract which party accepts most of the risk for price fluctuationcontractor
what is a characteristic of publically funded workthe bid is 'open to everyone'
According to the department orientation who is responsable for finding you an internshipyourself
Three types of playersOwner=Primary; Middle managers=Secondary; Field personal=third
the US department of labor created a taxonomy called themaster format