Construction Final Review part 6

AB
When there is current leakage in excess of .006 amperes a ___ will open the circuitGFCI
Electricity is brought into the building through the ____ and passes to the ____ panelService entrance, distribution
In awg system, the number of wire ____ as the size of wire gets smallerIncreases
A ___ is used to describe the wiring details of a specific piece of equipmentwiring diagram
A ___ should be installed in areas where moisture may be presentGFCI
Also referred to as riser diagrams, ___ diagrams are schematic drawingsone line diagrams
the smallest conductor permitted in branch circuits by the NEC is4 AWG
The equipment, such as the utility pole, that brings electrical current to a distribution panelservice entrance
A wire that is used to carry electricityConductor
the electromotive force that causes current to flowvoltage
A path consisting of two or more conductors carrying electricity from the source to a device and backcircuit
A wire connecting an electrical circuit to serve electrical devicesreceptacle
the insulated panel that recieves current from the source and distributes it through circuitsdistribution panel
The unit of measurement of currentAmpere
The ___ is the horizontal line portion of the welding symbolreferance line
The ____ indicates the type of weld to be usedweld symbol
when you need to know the size of the weld, refer to theweld dimensions
when a weld needs to be finshed, a finish symbol is included with thecontour
true or false a spot welds are specified by their diametertrue
true or false the abbreviation AW placed within the tail indicates thhat the weld needs to be alloy weldedfalse
true or false a welding symbol may include specs for the weld's groove angletrue
if a symbol is above the refrence line it indicates that the weld should be made on theoutside
A ___ symbol indicates that a weld requires 100% joint penetrationmelt-through
Notes that designate welding specifications are placed within the ___ of the welding symboltail
when estimating the labor costs you need to determine the ___ for each tradelabor rates
lists that a detail a contractors Various costs are calledtakeoffs
the ___ method of estimating breaks a building down into equal parts and then multiplies the units by dollars per unit costapproxmate
true or false a cost oversight commited by an estimator will not affect the profitabilit of the contractorfalse
true or false the approximate method of estimating is often used to help an owner decide whether or not to buildtrue
true or false the detailed estimating method works best when a project is unique in size and structuretrue
the labor costs used in estimates will typically be higher than the actual hourly rate paid to workerstrue
the approximate method of estimating costs is also known asbudget parameter method
a companys cost of doing busines is itsoverhead
The ___ rate is the amount of material that can be installed per hour or dayproduction