| A | B |
| specifications development | usually numbers which will measure how well the design works |
| problem-solving matrix | One of the methods that engineers use to organize their ideas and plans when doing a design is to use the... |
| TIA/EIA-569 specifies that each floor must have a minimum of one wiring closet and that additional wiring closets should be provided for each ___ | 1000 m2 |
| POP | point of presence |
| The wiring closet should include sufficient HVAC to maintain a room temperature of approximately ___ | 21 degrees |
| Relative humidity should be maintained at a level of _____ | 30-50 degrees |
| A common solution to the problem of surges and spikes is the use of ___ | surge suppressors |
| A ____ is a voltage increase above 110% of the normal voltage carried by a power line. | surge |
| A ___ is a brownout that lasts less than a second. | sag |
| A ____ is an impulse that produces a voltage overload on the power line. | spike |